Dimensi Utama Teknik Sipil
ISSN : -     EISSN : 26563312     DOI : https://doi.org/10.9744/duts
Core Subject : Engineering,
Jurnal Dimensi Utama Teknik Sipil (DUTS) promotes the widest possible dissemination of civil engineering knowledge by encouraging researchers to conduct research, build new or extend existing theoretical foundations, and contribute to practice at the corporate and national level. We aim to improve the dissemination quality in civil engineering field. The DUTS Journal welcomes technical/review/research papers, which publishes articles under the following fields: Construction Project Management, Construction Materials, Structural Engineering, and Geotechnical Engineering
Articles 6 Documents
Search results for , issue "Vol 3 No 2 (2016): October 2016" : 6 Documents clear
Model Proyeksi Dan Optimalisasi Cash Flow Multi Proyek Resela Irpiena; Ratna Setyawardani Alifen; Herry Pintardi Chandra
Dimensi Utama Teknik Sipil Vol 3 No 2 (2016): October 2016
Publisher : Program Studi Magister Teknik Sipil - Petra Christian University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (348.999 KB) | DOI: 10.9744/duts.3.2.1-8

Abstract

This study aims to create an integrated system that has the ability to project the schedule and cash flow of a multi project situation for construction companies, while optimizing them so that a more efficient schedule and financial planning is achieved. In this study, an efficient construction planning refers to a schedule combination that generates a cash flow with minimum overdraft for the company.This study focuses on utilizing floats from non-critical activities in initial or as-planned schedule. Iteration on the floats is done with evolutionary algorithm optimization method using projects’ durations and credit limit as constraints. The result is a combination of multi project schedules which generates the least amount of overdraft throughout the fiscal year to achieve minimum loans of thecompany.
Identifikasi dan Evaluasi Faktor-Faktor Kompetensi Sosial Manajer Proyek Danny Tanjaya; Lie Arijanto; Andi Andi
Dimensi Utama Teknik Sipil Vol 3 No 2 (2016): October 2016
Publisher : Program Studi Magister Teknik Sipil - Petra Christian University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (569.097 KB) | DOI: 10.9744/duts.3.2.9-16

Abstract

Kompetensi manajer proyek memiliki pengaruh kritikal terhadap kesuksesan proyek. Menurut Ahadzie (2008) kompetensi manajer proyek dikatagorikan menjadi dua yaitu soft skills dan  hard skills, menurut Boyatzis (2004) soft skills lebih kritikal untuk memprediksi performa manajer proyek daripada hard skills. Kompetensi sosial adalah bagian penting dari soft skills. Kompetensi sosial terdiri dari 8 variabel yaitu, manajemen konflik, kerja tim dan kerja sama, manajemen perubahan, dampak dan pengaruh, pemahaman interpersonal, kepemimpinan yang menginspirasi, kesadaran organisasi, dan hubungan personal. Faktor-faktor tersebut diteliti dengan kuisioner, respondennya adalah orang yang berpengalaman menjadi manajer proyek kontraktor dan anggota tim yang sedang atau pernah bekerja dalam tim yang dipimpin manajer proyek kontraktor di proyek konstruksi bangunan di Surabaya. Analisis yang digunakan adalah analisa deskriptif, t-test, serta analisa faktor. Kesimpulannya adalah faktor manajemen konflik manajer proyek dipersepsikan sangat penting oleh responden. Kompetensi sosial manajer proyek juga dapat dikelompokkan menjadi 2 faktor yaitu dampak  pengaruh dan manajemen konflik.
Analisa Faktor dan Diskriminan terhadap Kepuasan Penghuni Apartemen Sekitar Kampus di Surabaya : Studi Kasus Apartemen The Square, High Point dan Metropolis Nicko Vincent Yuwono; Timoticin Kwanda; Jani Rahardjo
Dimensi Utama Teknik Sipil Vol 3 No 2 (2016): October 2016
Publisher : Program Studi Magister Teknik Sipil - Petra Christian University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (479.467 KB) | DOI: 10.9744/duts.3.2.17-22

Abstract

Minat pembeli dalam membeli apartemen mahasiswa semakin meningkat setiap tahunnya. Namun, pembangunan apartemen yang meningkat pesat ternyata tidak lepas dari berbagai masalah yang timbul. Berbagai masalah yang timbul ini dikhawatirkan dapat menyebabkan penghuni merasa tidak puas dengan hunian mereka. Penelitian ini bertujuan untuk mengetahui faktor yang berpengaruh terhadap kepuasan penghuni apartemen sekitar kampus di Surabaya. Penelitian dimulai dengan menemukan variabel – variabel penyebab kepuasan berhuni melalui studi literatur yang dilanjutkan dengan proses pembagian kuesioner. Proses analisa data dilakukan dengan analisa deskriptif, analisa kepuasan, analisa cluster dan diakhiri dengan uji diskriminan. Hasil penelitian menunjukkan bahwa secara umum penghuni merasa puas dengan hunian mereka. Berdasarkan hasil analisa, didapatkan pula bahwa ada hubungan antara status penghuni ( mahasiswa atau non mahasiswa ) terhadap kualitas layanan dan produk. Hasil analisa faktor membuktikan bahwa benar, kelompok faktor kualitas produk dan layanan berpengaruh terhadap kepuasan berhuni.
Studi Mengenai Directed Changes dan Constructive Changes pada Proyek Bangunan Tinggi di Surabaya Yohana Gunawan Henuk; Paul Nugraha; Andi Andi
Dimensi Utama Teknik Sipil Vol 3 No 2 (2016): October 2016
Publisher : Program Studi Magister Teknik Sipil - Petra Christian University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (430.779 KB) | DOI: 10.9744/duts.3.2.23-30

Abstract

Change order terdiri dari directed changes (perubahan formal) dan constructive changes (perubahan  informal). Penelitian ini akan membahas mengenai apa saja faktor penyebab change order yang terjadi serta dampaknya dalam hal biaya, waktu dan produktivitas. Penelitian ini difokuskan pada proyek bangunan tinggi di Surabaya, termasuk melakukan studi kasus pada sebuah proyek kampus di Surabaya. Penelitian dimulai dengan menemukan faktor-faktor penyebab change order melalui studi literatur, yang dilanjutkan dengan proses penyusunan kuesioner.  Proses analisa data dilakukan dengan analisa deskriptif dan dilakukan Kruskal Wallis Test serta uji ANOVA. Hasil penelitian menunjukkan bahwa secara umum pendapat antara pihak owner, konsultan pengawas, dan kontraktor baik perubahan secara formal maupun informal tidak ada perbedaan. Sedangkan pendapat antara pihak tersebut terhadap dampak biaya, waktu, dan produktivitas pada proyek berbeda pada beberapa faktor. Sedangkan untuk hasil penelitian dari proyek kampus di Surabaya, didapati 7 faktor untuk perubahan formal serta 1 faktor untuk perubahan informal yang terjadi.
Perbandingan Penjadwalan Proyek Menggunakan Kurva “S” dan CPM Network pada Proyek “X” di Surabaya Wenly Sulistio; Andi Andi
Dimensi Utama Teknik Sipil Vol 3 No 2 (2016): October 2016
Publisher : Program Studi Magister Teknik Sipil - Petra Christian University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (603.054 KB) | DOI: 10.9744/duts.3.2.31-38

Abstract

Metode yang banyak digunakan dalam perencanaan jadwal proyek adalah metode CPM Network yang memperlihatkan analisa jaringan antar aktivitas dan juga metode Kurva “S” yang menggunakan grafik hubungan jadwal proyek dengan biaya proyek. Penelitian ini melakukan perencanaan jadwal menggunakan metode CPM Network dan Kurva “S”. Dari data yang didapat dilakukan perencanaan jadwal proyek menggunakan bantuan program Microsoft Project dan selanjutnya dilakukan pengamatan dilapangan. Hasil dari analisa kedua metode akan dilakukan perbandingan.Hasil dari CPM Network menunjukkan terjadi keterlambatan selama 173 hari. Hasil dari Kurva “S” menunjukkan bahwa proyek terselesaikan sebesar 54.5322% yang dalam rencana diselesaikan selama 245 hari, sehingga terjadi keterlambatan 105 hari. Hasil CPM Network menunjukkan proyek terlambat mulai periode ke-13. Metode Kurva S menunjukkan proyek terlambat mulai periode ke-11. CPM Network menghasilkan informasi analisa setiap periode sehingga dapat dilakukan pengendalian sesegera mungkin. Kurva “S” melihat secara biaya tetapi tidak dapat menginformasikan suatu aktivitas terlambat atau lebih cepat.
Potret Penerapan Perencanaan dan Pengendalian Jadwal Proyek pada Suatu Kontraktor BUMN Desi Widyastuti; Andi Andi
Dimensi Utama Teknik Sipil Vol 3 No 2 (2016): October 2016
Publisher : Program Studi Magister Teknik Sipil - Petra Christian University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (408.99 KB) | DOI: 10.9744/duts.3.2.39-46

Abstract

Penjadwalan proyek sangat berpengaruh untuk penentuan hasil dari suatu proyek. Proyek yang dapat diselesaikan tepat waktu akan memberikan dampak yang yang sangat besar salah satu efisiensi dari segi biaya sehingga perlu dibuat dan dijaga dengan baik. Penelitian ini ditujukan untuk mendapatkan potret penerapan perencanaan dan pengendalian jadwal proyek pada suatu kontraktor BUMN. Penelitian ini menggunakan kuisioner dan wawancara untuk mendapatkan data dan diolah menggunakan analisa deskriptif.Data penelitian didapatkan dari 11 (sebelas) respoden dengan 8 (delapan) proyek yang berbeda. Perencanaan jadwal proyek pada kontraktor ini sudah mempertimbangkan banyak faktor. Kontraktor ini hanya menerapkan bar chart pada penggunaan jadwal konstruksi. Monitoring jadwal pada kontraktor ini sudah dipantau secara berkala namun untuk pembaharuan jadwal masih belum dilaksanakan.

Page 1 of 1 | Total Record : 6